簡要描述:協(xié)助試驗(yàn)機(jī)的安裝,負(fù)責(zé)試驗(yàn)機(jī)的運(yùn)輸、調(diào)試。
產(chǎn)品分類
Product Category詳細(xì)介紹
品牌 | AIRTIMES/中航時(shí)代 |
---|
一、滿足標(biāo)準(zhǔn):
1、GB1408.1-2006《絕緣材料電氣強(qiáng)度試驗(yàn)方法》
2、GB1408.2-2006《絕緣材料電氣強(qiáng)度試驗(yàn)方法
第2部分:對應(yīng)用直流電壓試驗(yàn)的附加要求》
3、GB/T1695-2005《硫化橡膠工頻擊穿電壓強(qiáng)度和耐電壓的測定方法》
4、GB/T3333 電纜紙工頻電壓擊穿試驗(yàn)方法
5、HG/T 3330絕緣漆漆膜擊穿強(qiáng)度測定法
6、GB12656 電容器紙工頻電壓擊穿試驗(yàn)方法
7、ASTM D149《固體電絕緣材料工業(yè)電源頻率下的介電擊穿電壓和介電強(qiáng)度的試驗(yàn)方法》
二、適用范圍
主要適用于固體絕緣材料(如:塑料、橡膠、層壓材料、薄膜、樹脂、云母、陶瓷、玻璃、絕緣漆等絕緣材料及絕緣件)在工頻電壓或直流電壓下?lián)舸?qiáng)度和耐電壓的測試。
本儀器由電腦控制,是我公司自主研發(fā)的全新第三代介電擊穿檢測儀器,本儀器
電子控制系統(tǒng)是通過西門子PLC控制,數(shù)據(jù)采集方式通過光電隔離,有效解決試驗(yàn)過程中的抗干擾問題,軟件操作使用方便,能夠?qū)崟r(shí)顯示動態(tài)曲線,同時(shí)升壓速率無級可調(diào),可以根據(jù)自己的需要進(jìn)行升壓速率調(diào)節(jié),調(diào)節(jié)范圍在10V-5000V/S,處于國內(nèi)地位(國內(nèi)*能達(dá)到此功能的廠家),使升壓速率真正做到勻速、準(zhǔn)確,并能夠準(zhǔn)確測出漏電電流的數(shù)據(jù)。可實(shí)時(shí)繪制試驗(yàn)曲線,顯示試驗(yàn)數(shù)據(jù),判斷準(zhǔn)確,并可保存,分析,打印試驗(yàn)數(shù)據(jù)。
本系統(tǒng)能夠自動判別試樣擊穿并采集擊穿電壓數(shù)據(jù)及泄露電流,同時(shí)能夠在擊穿的瞬間電壓迅速降低自動歸零。軟件系統(tǒng)操作方便,性能穩(wěn)定,安全可靠。
三、軟件功能:
01、軟件平臺:WINDOWS窗口操作平臺,界面直觀,便于操作
02、曲線顯示:在實(shí)驗(yàn)過程中可以動態(tài)顯示試驗(yàn)曲線
03、數(shù)據(jù)導(dǎo)出:可以對試驗(yàn)結(jié)果導(dǎo)入EXCEL表格
04、實(shí)驗(yàn)報(bào)告:可以人為設(shè)置報(bào)告名稱,并對實(shí)驗(yàn)報(bào)告進(jìn)行打印
05、試驗(yàn)方式:可以根據(jù)需求對直流試驗(yàn)和交流試驗(yàn)進(jìn)行靈活選擇
06、試驗(yàn)方法:可以根據(jù)需求自行選擇擊穿電壓、耐壓試驗(yàn)、梯度試驗(yàn)
07、參數(shù)設(shè)置:可以根據(jù)不同的試驗(yàn)方式及試驗(yàn)方法靈活設(shè)置所需的不同參數(shù)值
08、試樣設(shè)置:可對不同標(biāo)準(zhǔn)的試樣參數(shù)靈活設(shè)置
09、人員管理:設(shè)置用戶名及密碼,不同的操作員登入進(jìn)行不同的試驗(yàn),互不影響
10、標(biāo)準(zhǔn)選擇:含有不同標(biāo)準(zhǔn),可根據(jù)需求自行選擇
11、連續(xù)操作:連續(xù)操作試驗(yàn)時(shí),可直接在軟件里結(jié)束試驗(yàn),進(jìn)行二次試驗(yàn)
四、技術(shù)要求:
01、輸入電壓: 交流220 V
02、輸出電壓: 交流 0--50 KV
直流0—50 KV
03、電器容量: 3KVA
04、擊穿zui大輸出電流:100mA 30mA 可調(diào)換
05、高壓分級: 0--5KV; 0-10KV;0-30KV; 0-40KV; 0-50KV,0-50KV;
06、升壓速率: 10V/S 100V/S 200V/S 500V/S 1000V/S 2500V/S 3000V/S 可手動設(shè)置
07、試驗(yàn)方式:
直流試驗(yàn):1、擊穿試驗(yàn) 2、梯度升壓 3、耐壓試驗(yàn)
交流試驗(yàn):1、擊穿試驗(yàn) 2、梯度升壓 3、耐壓試驗(yàn)
08、擊穿判停方式:1、電壓判停 2、電流判停
09、電壓試驗(yàn)精度: ≤ 1%
10、試驗(yàn)方式:1、絕緣試樣空氣中試驗(yàn)2、絕緣試樣浸油中試驗(yàn)
11、黃銅電極規(guī)格: ¢25mm 兩個(gè) ¢75mm一個(gè)
12、主機(jī)尺寸:長寬高約700*800*1500(MM)
13、操作臺尺寸:長寬高約700*800*700(MM)
14、防護(hù)罩材質(zhì):亞克力
15、設(shè)備重量:約100KG
五、安全保護(hù):
本儀器具有比較完善的安全防護(hù)措施:
本儀器具有多重防護(hù)措施,保證操作人員的人身安全
1、門限位保護(hù):不關(guān)門,即使通電點(diǎn)實(shí)驗(yàn)開始,設(shè)備無任何反應(yīng),軟件有:安全門未關(guān)閉提示。
2、電壓歸零保護(hù):如果在實(shí)驗(yàn)過程中,突然斷電,下次開機(jī)后,會自動回到零位,保證初始電壓為 在零位
3、終止電壓保護(hù):可以通過軟件設(shè)定終止電壓,保證在升壓過程中如果出現(xiàn)異常升到的電壓后,自動終止并歸零
4、高壓機(jī)械限位:如果軟件系統(tǒng)失去控制,電壓繼續(xù)往上升,到高壓限位后自動歸零
5、如果在擊穿后未判停,通過過流保護(hù)器采集數(shù)據(jù)保證電壓自動歸零
6、有高壓指示燈,通過觀察指示燈的狀態(tài)來判斷實(shí)在升壓還是在零位
7、如果長時(shí)間做實(shí)驗(yàn),為保證設(shè)備的良好運(yùn)行,設(shè)備留有變壓器排氣口,保證變壓器的良好運(yùn)行,
增長使用壽命
8、如果在實(shí)驗(yàn)中,試樣有異味或者出現(xiàn)燃燒和冒煙現(xiàn)象,可以通過排風(fēng)系統(tǒng)進(jìn)行排除。
9、獨(dú)立接地保護(hù)
10、短路保護(hù)
11、軟件誤操作保護(hù)
12、漏電保護(hù)
13、實(shí)驗(yàn)結(jié)束放電保護(hù)
六、配置
序號 | 名稱 | 數(shù)量 |
01 | 試驗(yàn)主機(jī) | 一臺 |
02 | 控制裝置 | 一套 |
03 | 試驗(yàn)電極 | 二套(三只) |
05 | 放電系統(tǒng) | 一套 |
06 | 控制系統(tǒng) | 一套 |
07 | 數(shù)據(jù)采集系統(tǒng) | 一套 |
08 | 試驗(yàn)軟件 | 一套 |
09 | 產(chǎn)品使用說明書 | 一份 |
10 | 保護(hù)電阻 | 一個(gè) |
11 | 產(chǎn)品合格證 | 一份 |
12 | 絕緣油油槽 | 一套 |
13 | 聯(lián)想電腦 | 一臺 |
14 | 噴墨打印機(jī) | 一臺 |
參數(shù)設(shè)置:
曲線顯示
打印報(bào)告:
油中試驗(yàn)
測試電極符合國標(biāo)1408要求
售后服務(wù)承諾
一、安裝調(diào)試:協(xié)助試驗(yàn)機(jī)的安裝,負(fù)責(zé)試驗(yàn)機(jī)的運(yùn)輸、調(diào)試。
二、驗(yàn)收標(biāo)準(zhǔn):試驗(yàn)機(jī)按訂貨技術(shù)附件進(jìn)行驗(yàn)收。終驗(yàn)收在買方進(jìn)行,對用戶提供的試樣進(jìn)行試驗(yàn),并提供測試報(bào)告。
三、培訓(xùn):安裝調(diào)試同時(shí),在儀器操作現(xiàn)場一次性免費(fèi)培訓(xùn)操作人員2-3名,該操作人員應(yīng)是由需方選派的長期穩(wěn)定的員工,培訓(xùn)后能夠?qū)υO(shè)備基本原理、軟件使用、操作、維護(hù)事項(xiàng)理解和應(yīng)用,使人員能夠獨(dú)立操作設(shè)備對樣品進(jìn)行檢測、分析,同時(shí)能進(jìn)行基本的維護(hù)。
四、軟件升級:終生免費(fèi)提供新版本控制軟件。
五、保修:
1、設(shè)備保修兩年,終身服務(wù),兩年內(nèi)非人為損壞的零部件免費(fèi)更換,保修期內(nèi)接到用戶邀請后, zui遲響應(yīng)時(shí)間為2小時(shí)內(nèi),在與用戶確認(rèn)故障后,我公司會在48小時(shí)內(nèi)派工程師到達(dá)現(xiàn)場進(jìn)行免費(fèi)服務(wù),盡快查清故障所在位置和故障原因,并向用戶及時(shí)報(bào)告故障的原因和排除辦法 。
2、保修期內(nèi)人為損壞的零部件按采購(加工)價(jià)格收費(fèi)更換。
3、保修期外繼續(xù)為用戶提供優(yōu)質(zhì)技術(shù)服務(wù),在接到用戶維修邀請后3天內(nèi)派工程師到達(dá)用戶現(xiàn)場進(jìn)行維修。并享有優(yōu)惠購買零配件的待遇。
4、傳感器過載及整機(jī)電路超壓損壞不在保修范圍內(nèi)。
六、售后管理:
我公司實(shí)現(xiàn)計(jì)算機(jī)化管理,實(shí)行客戶定期回訪制度,定期復(fù)查設(shè)備的工作情況,定期指導(dǎo)用戶對設(shè)備進(jìn)行保養(yǎng)和檢測,以便設(shè)備正常運(yùn)轉(zhuǎn),跟蹤客戶的設(shè)備使用情況,以便及時(shí)對設(shè)備進(jìn)行維護(hù)
One, meet the standard:
1, GB1408.1-2006 "electrical insulation strength material test method"
Test methods for electrical strength of 2, GB1408.2-2006 "insulation materials
The second part: Additional requirements for tests using direct voltage "
3, GB/T1695-2005 "vulcanized rubber power frequency voltage breakdown strength and voltage resistance determination method"
4, GB/T3333 cable paper power frequency voltage breakdown test method
5, HG/T 3330 insulation paint film breakdown strength determination method
6, the GB12656 capacitor paper power frequency voltage breakdown test method
Test methods of solid electrical insulating materials industrial power frequency dielectric breakdown voltage and dielectric strength of 7, ASTM "D149"
Two, the scope of application
Mainly applicable to solid insulation materials (such as: plastic, rubber, lamination material,film, resin, mica, ceramic, glass, insulating paint and other insulation material and insulation parts) in the frequency of the voltage or DC voltage breakdown strength and voltage withstand test.
The instrument is controlled by computer, is my company independent research and development of the new third generation dielectric breakdown testing instrument, the instrument of electronic control system is controlled by Siemens PLC, data acquisition modethrough a photoelectric isolation, effectively solving the problem of anti-interference ofsoftware test process, convenient in operation, can display real-time dynamic curve, while the rate of pressure rise stepless adjustable, can according to their own needs to boost rate adjustment, adjustment range in 10V-5000V/S, in the domestic leading position (the onlydomestic manufacturers can achieve this function), so that the pressure rate truly uniform,accurate, and can accuray measure the leakage current data. Real-time mapping test curve, test data show that, to judge accuray, and can save, print the test data analysis.
The system can automatically distinguish the sample breakdown and breakdown voltage andleakage current data acquisition, and can rapidly reduce auto zero at the moment of the voltage breakdown. The software system is easy to operate, stable performance, safe and reliable.
Three, the software function:
01, the software platform: WINDOWS windows operating platform, intuitive interface, easy operation
02, curve display: during the experiment can dynamically display the test curve
03, data export: can the test results into EXCEL table
04, experimental report: can be artificially set the report name, and print the test report
05, test mode: can flexibly select for DC test and AC test according to the requirements of
06, test methods: you can choose the breakdown voltage, voltage withstand test, gradient test according to the requirements of
07, the parameter settings: you can test different ways according to different parameters and test methods flexibly set the required value
08, sample set: on the specimen parameters of different standard flexible settings
09, personnel management: set the username and password, different operators in differenttest, mutual influence
Selection criteria: 10, with different standards, can choose according to need
11, continuous operation: continuous operation test, may be the end of the test directly in software, carries on two times of test
Four, the technical requirements:
01, the input voltage: AC 220 V
02, the output voltage: AC 0--50 KV
DC 0 - 50 KV
03, electrical capacity: 3KVA
04, the breakdown of the maximum output current: 100mA 30mA convertible
05, high grade: 0--5KV; 0-10KV; 0-30KV; 0-40KV; 0-50KV, 0-50KV;
06, the rate of pressure rise: 10V/S 100V/S 200V/S 500V/S 1000V/S 2500V/S 3000V/S can be set manually
07, test methods:
DC test: 1, breakdown test 2, pressure gradient, pressure test 3
AC test: 1, breakdown test 2, pressure gradient, pressure test 3
08, breakdown judgment stops: 1, stop 2, current voltage convicted sentenced to stop
09, voltage test accuracy: less than 1%
10, test methods: 1, insulation, insulation test specimen in 2 oil immersion test samples in air
11, brass electrode specifications: Phi 25mm two of 75mm a
12, the host size: length width height is about 700*800*1500 (MM)
13, the operating table size: length and width and height of about 700*800*700 (MM)
14, the protective cover material: acrylic
15, weight: about 100KG
Five, security protection:
The instrument has a relatively perfect safety protection measures:
This instrument has multiple protective measures to ensure the personal safety of operators
1, limit protection: not closed, even if the electricity point at the beginning of the experiment,without any reaction, equipment software: security door not closed tips.
2, voltage zero protection: if a sudden power failure in the course of the experiment, the next boot, will automatically return to zero, ensure the initial voltage is at zero
3, the termination voltage protection: can terminate the voltage through the software setting,guarantee in the boosting process if an exception occurs up to a specified voltage,automatically terminate and return to zero
4, high pressure mechanical limit: if you lose control software system, voltage to continue to rise, to the high-pressure limit after the automatic zero
5, if not found parked in the breakdown, through the overcurrent protective device data collection to ensure the voltage auto zero
6, there is high pressure indicator light, light by observing the state to determine really boostor at zero
7, if a long time to do the experiment, in order to ensure a good operation of equipment,equipment have transformer exhaust port, to ensure the good operation of transformer,
An increase of service life
8, if in the course of the experiment, samples have peculiar smell or the emergence ofcombustion and smoke phenomenon, can be ruled out through the ventilation system.
9, independent earthing protection
10, short circuit protection
11, software protection misoperation
12, leakage protection
13, the end of the experiment the discharge protection
產(chǎn)品咨詢
歡迎您關(guān)注我們的微信公眾號了解更多信息
電話
微信掃一掃